Stryker
Construction
Part 2
Chassis
Linda went to Depot and got me a new supply of Tenax-7R solvent,
so
some major construction occurred tonight. The whole drivetrain was
installed on the bottom of the hull, using most of the "A" sprue. The
first PE went on as well, some sort of screen over the four rear
shocks. Armor plates were attached to the lower front hull as well.

Drivetrain construction on the bottom of the hull. The real
vehicle is an 8x8.

Tires were added all around and the wheel hubs
were attached to the chassis.
Then I got carried away. I put
in a partial driver's compartment and began work on a driver (upper
torso only, with a MOLLE vest and CVC helmet). I made a engine
compartment
bulkhead
out of sheet plastic, put a small piece of brass tubing over one of the
visible shock absorber mounts to increase its diameter, added a
representative radio and painted the whole interior white. I plan to
have the driver's hatch partially open, with just the driver's head
showing, but I thought that the cylinder and radio would be visible, so
I added them, along with the bulkhead.
Next
Adding Armor
Back to Index